With two revisions from WUFI and some Therm modeling, we have a final design. We will be submitting to PHIUS for pre certification soon and expect very little revisions needed from that review. Once we get pre-certified, we will then be able to submit plans to the County for permitting.
- CLT construction
- RockWool insulation. 10″ walls, 21″ roof, 6″ under slab
- Prosoco Cat5, Fast Flash and Joint and Seam liquid WRB and AB
- 11kw solar array
- Rammed earth knee wall under solar array
- Minotair ERV
- Earth tube
- Triple pane windows
- Triple pane entry door and two custom Passive doors
- Rain screen cladding system
- Incorporate some Biophilic designs
- Capture 100% rainwater runoff for domestic use
= PHIUS + and Source Zero certified
= Zero Energy building